We use essential storage to run the site. With your permission, we use Google Analytics to understand site use and improve our services. We do not use analytics to collect the details you enter in calculators or forms.

Privacy Policy

ClearPath modification pathways

Modifying a light vehicle in the ACT

ACT applies the NCOP alongside its local vehicle requirements. Owner-certified modifications and significant or extensive modifications follow different pathways.

Where certification is required, arrange a recognised engineering signatory and an Access Canberra Motor Vehicle Inspection Station inspection. The engineering report needs to cover the modifications, with relevant checklists and any applicable test reports.

For a proposed GVM increase, ask Access Canberra about the appropriate inspection and engineering process. It is not a simple change of vehicle description.

Prepare the current ratings, existing modifications and proposed package before seeking advice. Use the Navigator to assemble a preliminary checklist.

Prepare a modification evidence worksheetFree ACT and NSW preparation guidance. No approval or certification is provided.

Assess your complete build

Review your accessories, touring load and towing setup with the existing automated advisory assessment.

Complete Vehicle Build Assessment — $149 AUD

Advisory report. Engineering certification and inspection are separate.

Official sources

Sources checked 2026-09-26. Confirm current requirements before work.

Preliminary advisory guidance only. This is not engineering certification, registration approval, a roadworthiness inspection or a finding that your vehicle is safe or legal. Confirm the complete modification package with the relevant road authority and an appropriately authorised certifier before proceeding. The paid ClearPath assessment is also advisory.